Description of Actual Services Provided by the Staff
Engineering Surveying, Materials investigations and testing, Drainage and Hydrological investigations and Structural and Civil engineering design and construction supervision. “(Preparation of Specifications, Bar Bending Schedules, working drawings, As Built drawings, assists in dispute resolution, issuing certificates of completion, preparation of schedules of defects and certifying the satisfactory completion of defects)”. The approximate cost of the project was KES 700 Million.